Environmental Impact Assessment

Year 2015

 

Title: Construction of system II.of Albertirsa-Martonvásár 400 kV long-distance transmission line to Szigetcsép 400/120kV transformer section. Flora and fauna and landscape protection sections of preliminary examination documentation.

Client: PÖYRY Erőterv Inc.

Title: Preparation of plans and studies to complex development elements of flood protection system. Environmental Impact Assessments along Tisza, Túr and Batár

Client: Viziterv Environ Ltd.

Title: Construction of system I-II.ofDunamenti Erőmű Dunavarsány 132 kV long-distance transmission line to Szigetcsép 400/120kV transformer section. Flora and fauna and landscape protection sections of preliminary examination documentation.

Client: PÖYRY Erőterv Inc.

 

Year 2014

 

Title: Preparation of environmental impact assessment connecting to installation of 400/120 kV electric substation at Kerepes

Client: PÖYRY Erőterv Inc.

Title: Preparation of environmental impact assessment connecting to installation of 400/120 kW electric substation at Perkáta

Client: PÖYRY Erőterv Inc.

Title: Preparation of wildlife and landscape conservation tasks emerging in connection with the modification of 220 kV long-distance transmission line at Detk-Sajószöged

Client: PÖYRY Erőterv Inc.

Title: Preliminary examination documentation for complex development  of the elements of flood prevention system. Tisza left side dike

Client: Viziterv Environ Ltd.

Title: Natura 2000 Impact Assessment, wildlife and landscape conservation tasks in connection with long-distance transmission line of 400kV at Gönyű-Bős.

Client: PÖYRY ERŐTERV Inc.

Title: Natura 2000 Impact Assessment, wildlife and landscape conservation tasks in connection with long-distance transmission line of 400kV at Sajóivánka-Rimaszombat

Client: PÖYRY ERŐTERV Inc.

 

Year 2013

 

Title: Preparation of sections flora and fauna and landscape protection study necessary for environment permitting procerure for establishing a Solar power plant at the area of Mátrai Erőmű Inc.

Client: PÖYRY-ERŐTERV Inc.

Title: Preparation of new 132 kV long-distance transmission line at Nyíregyháza Simai út. Sections of flora and fauna protection

Client: PÖYRY-ERŐTERV Inc.

Title: Preparation of new 132 kV long-distance transmission line at Debrecen. Sections of flora , fauna and landscape protection

Client: PÖYRY-ERŐTERV Inc.

Title: Sections flora, fauna and landscape protection of 35 kV transmission line at Visonta K-II mine

Client: PÖYRY-ERŐTERV Inc.

Title: Preparation of new 400 kV long-distance transmission line at Albertirsa-Göd Sections of flora and fauna protection Natura 2000 Impact assessment

Client: PÖYRY-ERŐTERV Inc.

Title: Preparation of new 400 kV long-distance transmission line at Perkáta. Sections of flora, fauna and landscape protection

Client: PÖYRY-ERŐTERV Inc.

Title: M85 Canal Part II. Detailed Environment Impact Assessment

Client: RODEN Engineering Office Ltd.

 

Year 2012

 

Title: K085.03 M85 Canal turn II.

Client: RODEN Engineering Office Ltd.

Title: Preliminary Environmental Study of New block in Paks nuclear power plant (chapters 4-12)

Client: PÖYRY-ERŐTERV Inc.

Title: KEOP 7.2.1.3. and  KEOP 2.1.3. Configuration of water infrastructure supporting landscape management in flood level reducing reservoirs Nagykunság, Tiszaroff, Hanyi-Tiszasüly

Client: IBS Management Nonprofit Ltd.

Title: Development of landscape management infrastructure in Bordogköz especially on the area of Cigánd and Bereg flood-level reducing Rezervoir

Client: VIZITERV ENVIRON Ltd..

Title: Development of landscape- area- and husbandry surrounding of Szamos-Kraszna flood-level reducing Rezervoir

Client: VIZITERV ENVIRON Ltd..

Title: Water retention and supplement in Homokhátság

Client: National Water Authority

 

Year 2011

 

Title: Preliminary Environmental Study of New block in Paks nuclear power plant (chapters 1-3)

Client: ETV-ERŐTERV Inc.

Title: Examination documentation necessary to preliminary environment assessment of planned wind power plant in Városlőd suburb

Client: Bakony wind power plant Ltd.

Title: Preliminary Environmental Study of New block in Paks nuclear power plant (chapters 4-12)

Client: ETV-ERŐTERV Inc.

Title: Improvement of water management and water quality of Ráckeve-Soroksár Danube section

Client: Central Directorate of Water end Environment

 

Year 2010

 

Title: Examination documentation necessary to preliminary environment assessment of planned wind power plant in Városlőd suburb

Client: Bakony wind power plant Ltd.

Title: Improvement of water management and water quality of Ráckeve-Soroksár Danube section

Client: Central Directorate of Water end Environment

 

Year 2009

 

Title: Environment Impact Assessment of Bereg flood plain

Client: Viziterv-Environ

Title: Total Environmental Impact Assessment of Álomsziget project in Hajógyár isle of Budapest district III.

Client: Álom Sziget 2004 Ltd. Developer of Immovable estates.

Title: Total canalization of Budapest

Client: FÖMTERV Infrastructure Designing Company

 

Year 2008

 

Title: Preparation of Impact assessment of Tokaj historical wine area from the point of view of cultural world heritage, with special regard to problems raised by Biomass Power Station in Szerencs

Client: Institute of Protection of Cultural Heritage

Title: Total Environmental Impact Assessment of Álomsziget project in Hajógyár isle of Budapest district III.

Client: Álom Sziget 2004 Ltd. Developer of Immovable estates.

Title: Expert opinion in connection with the expectable aero-environmental impact on Hungarian air of the planned waste-utilization plant in Heiligenkreutz

Client: Municipality of Szentgotthárd town

 

Year 2007

 

Title: Complex rehabilitation of Túr water system: feasibility study for development preparation

Client: VIZITERV Environ Ltd.

Title: Preliminary examination documentation of land- and water-management conception based on water retention in Bodrogköz.

Client: VIZITERV Consult Ltd.

Title: Preparation of Hungarian-Ukrainian complex flood-control - water management - floodplain revitalisation development plans for Bereg-Borzsa basin. Environmental Impact Study

Client: VIZITERV Environ Ltd.

Title: Completing of Preliminary Environment Assessment of Gyál thermal bath

Client: Horváth private entrepreneur

Title: Improvement of Vásárhelyi Plan. Strategic environment plan. Preliminary environment studies for flood gate systems in Tisza valley

Client: Ministry of  Environment and Water

Title: Preliminary Environment Assessment of Gyál thermal bath

Client: PESTTERV Ltd.

 

Year 2006

 

Title: Execution of research program for final deposition of radioactive waste of small and medium activity emerging in nuclear power station.

Client: ETV-ERŐTERV Inc.

Title: Preliminary environmental Impact Assessment of Tisza section 198.5 -206.1 in the framework of VTT Phase I.

Client: National Water Inspectorate

Title: Improvement of Vásárhelyi Plan

Client: Ministry of  Environment and Water

Title: Environment impact assessment for lengthen of operation period at Paks Nuclear Power Station

Client: ETV-ERŐTERV Inc.

Title: Training for methodology of new Impact Assessments.

Client: Ministry of  Environment and Water

Title: Preliminary assessment documentation of thermal bath in Gyál

Client: PESTTERV Ltd.

 

Years 2005 - 2001

 

Research program for final deposition of radioactive waste of small and medium activity emerging in nuclear power station.

Client: ETV-Erőterv Inc.

Preparation of preliminary study of planned floodplain intervention in the framework of Vásárhelyi plan.

Client: VITUKI Consult Inc.

Preparation of Environmental Study necessary to development of Börgönd airport.

Client: Alba Airport Ltd.

Environment impact assessment for lengthen of operation period at Paks Nuclear Power Station

Client: ETV-Erőterv Inc.

New technologies in environment impact. Education

Client: Ministry of Environment and Water

Preliminary Environmental Assessment  of Börgönd airport as well as allocation of noise prevention zone.

Client: Székesfehérvár Airport Ltd.

Environmental Impact Assessment of the radioactive waste treatment plant at Püspökszilágy

Client: ETV-ERŐTERV Inc.

Preparation of Preliminary Environmental Assessment for extending the life cycle of Paks Nuclear Power Station.

Client: ETV-ERŐTERV Inc.

Elaboration of PEA for extending the life cycle of Paks Nuclear Power Station

Client: ETV-ERŐTERV Inc.

Preliminary environment assessment of the Wind Power Station at Tés. Protection of wildlife and landscape.

Client: ÖKO-SZ Environment service

Preliminary environment assessment of the waste deposition site at Kiskunhalas.

Client: For Environ Ltd.

Preliminary environment assessment of the boxed, closed system composting plant to be built beside the waste water treatment plant of Kecskemét

Client: HORIZONTÁL Ltd.

EIA of DUNAPACK

Client: DENKSTATT Hungary Ltd.

Extension of lifetime of the Paks Nuclear Power station. Foundation and elaboration of Preliminary EIA.

Client: ETV Erőterv Inc.

Environment protection part of the permission plan for construction of the Lindemann type facility aimed for recirculation of deteriorated cars at the site of KOALFÉM Ltd. Miskolc

Client: KOALFFÉM Ltd.